DB HiTek 8-inch SiC MOSFET qualification
Analysis based on 10 articles · First reported Jul 20, 2026 · Last updated Sep 09, 2026
DB HiTek's successful qualification of its 8-inch SiC MOSFET process strengthens its competitive position in the growing silicon carbide foundry market, potentially attracting new customers and boosting future revenue. The move aligns with industry trends toward 8-inch wafers, which could enhance production efficiency and cost competitiveness, positively impacting DB HiTek's market standing.
DB HiTek, South Korea's leading pure-play 8-inch foundry, announced on September 9, 2026, that it has successfully completed reliability qualification for its 1,200 V silicon carbide (SiC) MOSFET process on 8-inch (200 mm) wafers. This achievement establishes the world's first complete 8-inch SiC foundry process flow, positioning DB HiTek to enter the 8-inch SiC foundry market with volume production targeted for 2027. The company is providing customers with Process Design Kits (PDKs) for its first- and second-generation 1,200 V SiC MOSFET processes, with a third-generation PDK scheduled for release in November. The second-generation process achieves a specific on-resistance of 2.5 mΩ*cm² or less and a threshold voltage of 3 V or higher. The third-generation process aims for a specific on-resistance of 2.3 mΩ*cm² or less and a short-circuit withstand time of at least 2.5 μs. DB HiTek plans to complete process preparations and provide access to longstanding customers in the third quarter of 2026, with broader availability beginning in the second quarter of 2027. This development is significant as the semiconductor industry transitions from 6-inch to 8-inch wafers for SiC production, which offers improved efficiency and cost competitiveness for applications in electric vehicles, renewable energy, and industrial power equipment.
Set up alerts, explore entity relationships, search across thousands of events, and build custom intelligence feeds.
Open Dashboard