Tata Steel Meramandali Coke Oven Gas Injection
Analysis based on 6 articles · First reported Sep 10, 2026 · Last updated Sep 11, 2026
The commissioning reinforces Tata Steel's positioning in low-carbon steelmaking, which could support its long-term cost efficiency and ESG credentials, potentially modestly positive for investor sentiment. However, the immediate financial impact is limited as the project is a single-facility technology deployment with no disclosed capital expenditure or production volume changes.
Tata Steel commissioned India's first coke oven gas (COG) injection project at Blast Furnace 1 of its Meramandali steel plant in India — Odisha's Dhenkanal district. The project, announced on 10 September 2026, injects hydrogen- and hydrocarbon-rich coke oven gas directly into the blast furnace through tuyeres, substituting conventional fossil fuels as a reductant. The technology was developed with support from technology partner SMS Group — Paul Wurth S.A.-SMS and equipment supplier Kobelco. The initiative is expected to reduce fossil fuel consumption and carbon dioxide emissions, and enables the blast furnace to operate with a three-fuel system, enhancing operational flexibility and efficiency. According to the company, the technology can save approximately 0.65 kilogrammes of coke for each kilogramme of coke oven gas injected. The project aligns with Tata Steel's Net Zero by 2045 target and strengthens its leadership in green steel production. Tata Steel Meramandali, formerly Tata Steel BSL Limited, became part of Tata Steel following its acquisition by Bamnipal Steel Ltd, a wholly owned subsidiary of Tata Steel, in 2018 under India's Insolvency and Bankruptcy Code. The facility is India's largest producer of auto-grade steel and has previously demonstrated coal bed methane, hydrogen, and biochar injection in blast furnaces.
Set up alerts, explore entity relationships, search across thousands of events, and build custom intelligence feeds.
Open Dashboard